Built straight, built to last
As of this autumn we are typically booking two to three weeks out for new projects. Structural repairs that are urgent, like a compromised sill plate or a failing beam, we try to get to faster. Call or email and we will tell you exactly where the schedule stands.
We pull all required permits and handle the inspection schedule. The permit cost gets added to your invoice at cost, no markup. If a project does not require a permit in your municipality, we will tell you that upfront.
Check, bank transfer, or cash. We do not accept credit cards at this time. We ask for a deposit of one-third at contract signing, one-third at the midpoint, and the balance on the day of final walkthrough.
We stop, take photos, and call you before we do anything else. You get a written change order with the added scope and cost before we proceed. We have never added a line item to a final invoice that the client did not approve in writing first.
We work through November on most exterior projects. Once the ground is frozen solid, we shift to interior work: framing, trim, shelving, and renovation coordination. If you have an exterior project, autumn is the time to get it scheduled.